Transporting China-made products, supporting global construction, and collaboratively creating a better world.
Group Switchboard:
Email:
Steel Metallurgy
We possess intimate knowledge of the equipment and structural components involved in every stage of the process, from raw material handling to the output of high-end finished products. We have successfully delivered several integrated steel plants composed of multiple sub-projects, covering mineral processing, pelletizing, direct reduced iron (DRI), steelmaking, rolling, galvanizing, and auxiliary facilities.
Sinosteel Bolivia Mutun Steel Plant Project
Undertaking the Bolivia Integrated Steel Plant Project funded by a preferential loan from the Export-Import Bank of China, we completed the shipment of over 200,000 revenue tons of general cargo and 800+ TEUs of equipment and materials. Shipments were dispatched from ports in China, Europe, and the Middle East to South America. Upon discharge, the cargo was transported inland over 2,000 kilometers across mountain ranges to the plateau construction site, including dozens of heavy-lift and out-of-gauge items weighing over 100 tons each.
Solution
|
General Cargo Transportation Route Origin – Discharge at Chilean Port – Final Project Site in Bolivia (Sea-Land Multimodal Transport) |
Heavy-Lift and Out-of-Gauge Cargo Rotterdam, Netherlands – Port of Zarate, Argentina – Puerto Jennefer, Bolivia – Final project site in Bolivia. Transport Mode: Sea + Barge + Land |
|
On-Time Delivery We overcame significant challenges during the three-year COVID-19 pandemic—including volatile freight rates, travel restrictions, and frequent port strikes—to ensure on-time delivery. |
Out-of-Gauge Cargo We resolved the challenge of transporting dozens of heavy-lift and out-of-gauge goods—each exceeding 100 tons—that could not be moved via conventional routes. |



